If you are building your first house, the process can feel mysterious. What happens first? How long does each stage take? When do you pay? This guide walks through the main stages of house construction in the order they usually happen, so you know what to expect and what to check at each step.
Stage 1: Planning and design
Before any digging starts, you finalise the plan. This includes room sizes, number of floors, door and window positions and, if you follow it, Vastu. Indian Builders prepares Vastu-compliant plans. Read our Vastu tips for an east-facing house if you are deciding the layout. Also fix your budget at this stage; see how to plan your house construction budget.
Stage 2: Approvals and documents
You need the building plan approved by the local authority before construction, and your land documents must be in order. Requirements differ by location, so confirm with the relevant local body. Our guides on DTCP approval and documents needed for house construction give a general overview.
Stage 3: Agreement and site preparation
Sign a written agreement with the builder covering the rate, specification, schedule, payment stages and exclusions. Then the site is cleared, boundaries marked and temporary water, power and storage arranged.
At Indian Builders there is no advance, and payments are stage-wise. We also set up 24/7 CCTV at the site from the bhoomi pooja.
Stage 4: Bhoomi pooja and marking
Many families perform a bhoomi pooja on an auspicious day to begin. After that, the engineer marks the layout on the ground according to the approved plan, with column positions and the building outline.
Stage 5: Excavation and foundation
Pits are dug for footings. The site engineer checks depth and soil, steel is placed for the footings, and concrete is poured. The foundation carries the whole house, so this stage should never be rushed. Check the depth, steel and concrete before each pour.
Stage 6: Plinth beam and plinth filling
Columns rise to plinth level, and a beam ties them together. The space inside is filled and compacted. A damp-proof course is provided at this level to stop moisture rising into walls. Termite treatment is usually done at this stage as well, if included in the specification.
Stage 7: Columns, beams and roof slab
For a framed structure, the columns and beams are cast, followed by the roof slab. Shuttering is erected, steel is tied and concrete is poured and compacted. Our roof slabs use RCC 1:2:4 (M20) concrete at 5 inches thick, with ISI steel. After concreting, the slab must be cured with water for the period your engineer specifies. The materials used here matter greatly, so read our guides on TMT steel bars and choosing cement.
Stage 8: Masonry (walls)
Walls are built using your chosen material, whether hollow block, fly ash brick or red brick. Door and window frames are fixed, and lintels are cast over openings. See hollow block vs fly ash vs red brick for choosing the material.
Stage 9: Electrical and plumbing rough-in
Pipes and conduits are laid inside the walls and floors before plastering. This is the time to confirm every switch, socket, light and fan point, and every tap and drain position. Changes later are messy and costly. Our standard specification uses Finolex wires.
Stage 10: Plastering and waterproofing
Walls and ceilings are plastered and cured. Bathrooms get waterproofing (we use Dr. Fixit) and a flood test before tiling. The roof is treated for waterproofing as agreed in your specification. Read more in waterproofing a new house.
Stage 11: Flooring and tiling
Tiles are laid in rooms, kitchen and bathrooms, and wall tiles are fixed in wet areas. Our standard allowance is tiles up to ₹45 per sq.ft. See how to choose tiles.
Stage 12: Doors, windows and fittings
Doors, uPVC windows, grills as needed, and sanitaryware (we use Hindware) are fitted, along with electrical switches, fixtures and water connections.
Stage 13: Painting and finishing
Putty, primer and paint are applied, using brands such as Asian, Berger, Dulux or Indigo. Final touch-ups, cleaning and minor corrections follow.
Stage 14: Inspection and handover
You and the engineer walk through the house with a checklist: tiles, taps, switches, doors, paint, leaks, drainage. Defects are corrected. At Indian Builders, the final 2% of payment is made only after inspection. For example, on a ₹24,31,200 project (1,200 sq.ft at ₹2,026), the final 2% is ₹48,624. Then you receive possession, ready for griha pravesam. Our package houses (1 BHK and 2 BHK) are handed over in 5 months. Custom plans have their own timeline, which should be written down in the agreement.
Utilities and connections
EB (electricity) and water connections and bills are not part of the construction rate, so apply for them in time. The same goes for the compound wall and interior work, which are separate.
How you can stay involved
- Visit the site regularly and take photos.
- Check each stage with the site engineer before moving on.
- Use the CCTV to see progress when you cannot visit.
- Make changes early, ideally before the walls go up.
Our guide on checking construction quality at site gives a list of what to look for.
Typical sequence of payments
Payments should follow the work. A sensible schedule links each instalment to a completed stage, such as foundation, roof slab, masonry, plastering, flooring and finishing, with a small part held back until the final inspection. Ask your builder for the schedule in writing before work starts, and match it against your loan release stages if you are borrowing from a bank.